Optimization

Tag:
  • Optimize:  Select if you are running an optimized plan. Before selecting, verify that you selected Constraints tabbed region, Constrained Plan field. If you clear, you cannot enter any other information in this tabbed region.
  •  
  • Enforce Sourcing Constraints: Select if you want to enforce the sourcing splits in the item sourcing rules. For an optimized plan, the planning engine may override these sourcing splits if it results in less cost. For unconstrained and constrained plans, the planning engine respects these sourcing splits without regard to this option.
  1. Maximize inventory turns: Specify a weighting percentage from 0 to 1.
  2. Maximize plan profit: Specify a weighting percentage from 0 to 1.
  3. Maximize on-time delivery: Specify a weighting percentage from 0 to 1.
  • Exceeding material capacity %: Enter a numerical value to quantify the impact of exceeding material capacity. For example, if you enter 50, the penalty factor is 50%.
  • Exceeding resource capacity %: Enter a numerical value to quantify the impact of exceeding resource capacity. For example, if you enter 50, the penalty factor is 50%.
  • Exceeding transportation capacity %: Enter a numerical value to quantify the impact of exceeding transportation capacity. For example, if you enter 50, the penalty factor is 50%.
  • Demand lateness %: Enter a numerical value to quantify the impact of late demand. For example, if you enter 50, the penalty factor is 50%.