Organizations

Org: An organization which this plan should plan.
Net WIP: Select to consider discrete jobs and other production orders as supply in the planning demand/supply netting process.
Net Reservations: If checked, ASCP generates pegging of on-hand supply to sales orders that matches the reservations recorded in the source transaction system.
Net Purchases: Select to consider purchase orders, purchase requisitions, in-transit shipments and other nonproduction order scheduled receipts as supply in the planning demand/supply netting process. This option covers all scheduled receipts not covered by the Net WIP option.
Plan Safety Stock: Select to consider plan safety stock demand and supply in the planning demand/supply netting process.
Include Sales Order: Select to invoke forecast consumption within ASCP for the selected organization. Check this if the demand schedules for the organization are unconsumed forecasts. Uncheck this if the demand schedules for the organization are consumed forecasts plus sales orders in the form of master demand schedules.
Bill of Resource: Select Bill of Resources from the list of values.
Simulation Set: Select a Simulation Set from the list of values. A simulation set is a set of adjustments to the base availability calendar of a resource, and is defined via the Oracle Bills of Material Department Resources form. You can define different simulation sets to model different availability scenarios (for example, the base availability calendar reflects 5 day operations; simulation set 1 reflects working 6 day operations; simulation set 2 reflects 7 day operations). The planning engine applies the simulation set to all
resources in the organization.
Oracle Enterprise Asset Management plans maintenance activity and creates maintenance work orders which may specify shutdown of equipment resources. If you are using Oracle Enterprise Asset Management, you can pass your maintenance downtimes to the planning engine. To plan for these shutdowns in Oracle Advanced Supply Chain Planning, run the Oracle Enterprise Asset Management Load Equipment Maintenance Downtime concurrent process.
The process creates a simulation set with the downtimes recorded as capacity changes for reduced hours. You can specify the simulation set in the Organizations tabbed region of the Plan Options window. When the plan is run, the planning engine uses this simulation set to calculate the reduction in the available capacity of resources due to maintenance downtime. The planning engine plans production activities for these resources after considering the reduction in available capacity. You can view the impact of this change on the resource availability and usage profiles in the Planner Workbench.
Demand Schedule: Select the names of demand schedules, forecasts, and plans that drive this plan.
Interplant: If selected, the planning engine uses only interorganization orders and demands from interorganization planned orders. If cleared, the planning engine uses demands from all planned orders.
Supply Schedules: Select the name of supply schedules that participate in this plan.
Subinventory Netting: Opens the Subinventory Netting window.
Using an Existing Plan as a Demand Schedule For New Plan
The plan for one organization can be used as a demand (or demand schedule) for the plan of another organization.

Note: Users can collect forecasts into the APS planning server. Optionally, they can choose to consume forecasts by sales orders
when they run ASCP plans. Forecasts are consumed if the Include Sales Order check box in the Organizations tab of the Plan Options
window is checked. For multilevel ATO items, forecasts are consumed at all levels if the forecast explosion has occurred in the
source instance prior to the collection.
1. Choose Supply Chain Plan > Names to create a new plan for the organization that will use an existing plan as a source.
The Supply Chain Plan Names window appears.
2. Select Plan Options. The Plan Options window appears.
3. Choose the Organizations tab.
4. Specify the plan name to be used as a source for the new plan in the Demand Schedule portion of the window.
5. Click Subinventory Netting. The Subinventory Netting window appears.