Mat. Control (Subinventory and Locator)

open the Material Control tabbed region and enter the supply type.
Enter the supply subinventory and the locator.
If you have set the BOM: Default WIP Supply Values for Components profile option to Yes, these values default from the item master. If any of these values are left blank, Work in Process will read the values contained in the item master.

Comments

Post new comment

The content of this field is kept private and will not be shown publicly.
All Rights Reserved. Copyright 2008-11 OracleUG.com.