Other fields in line level

Operation Yield

Open the Operation Yield tabbed region. You can define routing networks for Standard, Flow, and Lot-based routings.
1. If the routing is lot-based, then the Yield, CUM Yield, Reverse CUM Yield, and Include in Rollup fields will display. To enable Operation Yield in Shop Floor Management, enter expected operation yields for each operation listed. For example, enter 0.9 for a 90% yield. These fields are displayed for Shop Floor Management enabled organizations.

2. Indicate whether the operation yield is to be considered in the cost rollup, as required by the costing team.

ECO
Open the ECO tabbed region and verify the following:
The Implemented check box indicates whether the component is implemented.
Checked: Operation is on a pending Engineering Change Order (ECO)
Unchecked: Operation is on implemented ECO or was added directly to the routing

Description
Open the Description tabbed region and enter a description of the operation.

Comments

Post new comment

The content of this field is kept private and will not be shown publicly.
All Rights Reserved. Copyright 2008-11 OracleUG.com.