Consolidation Setup

When you perform a Pick Drop, Staging Move, or LPN Mass Consolidate for material consolidated across deliveries, the following conditions apply:
• All lines in the From and To LPN, if the material resides in an existing LPN, must be assigned to a delivery.
• The destination LPN must be in a locator of type Staging.
• The destination LPN must not have any loose material. If LPNs are nested, the nested LPNs can contain loose material.
• All tasks loaded into the From LPN and To LPN must have an operation plan with the consolidation method set to Across Deliveries.
Shipping Validation
Transportation Execution validates material consolidated across deliveries and determines if a valid deconsolidation point exists, and if the ship-from location are the same. After consolidation, and at ship confirm, Shipping Execution automatically
creates a trip for the second leg, from the deconsolidation point to the final ship-to destination as follows:
- If no trips associated to the deliveries exist for the second leg, Shipping Execution creates a trip for each delivery from the deconsolidation point to the final ship-to destination.
- If deliveries for the second leg exist, Shipping Execution deletes the delivery from the associated trip, and creates a new trip from the deconsolidation point to the final ship-to destination.


Comments
Post new comment