Manufacturing Scheduling

If you have installed Oracle Manufacturing Scheduling, you can use the fields on this tab to change scheduling information
defaulted from the WIP Parameters window. To enable this functionality, select the Constraint Based Scheduler check box on the Scheduling tab of the WIP Parameters window.
Warning: Do not check the Constraint Based Schedule check box unless you have installed Oracle Manufacturing
Scheduling.

1. Select the Scheduling tab.

2. In the Requested Due Date field, you can enter a due date that is different than the completion date for the job.

3. In the Scheduling Priority field, enter a number ranging from 1 to 99, with 1 being the highest priority. The default priority is 10.

4. In the Penalty Per Day Late field, enter a penalty factor value used for scheduling jobs not completed by the scheduled due date. Higher penalties generate attempts in scheduling to circumvent such an event.

5. In the Due Date Tolerance (days) field, specify the maximum number of days the job can be delayed during scheduling.

6. Save your work.