Schedule group and project information

:

1. On the Schedule Group, Project tab, select the Schedule Group.
You have the option to assign discrete jobs to any active schedule group.

2. Enter a Build Sequence identifier.

3. Select a production Line.
You can select any active production line. Production lines are optional for discrete jobs. They are not used for scheduling or
transactional purposes. However, if you do select a production line, the combination of schedule group, build sequence, and
production line must be unique.

4. Select a Project and, if required, a task.
You can only select a project if the current organization’s Project References Enabled parameter is set in Oracle Inventory. You must select a task if the Project Control Level parameter is set to Task and you have entered a project.

5. Enter the Unit Number. This enables you to associate an end item model/unit effectivity number with the item.
You must have Oracle Project Manufacturing installed, the item must be under model/unit effectivity control, and you must have a model/unit number associated with it to enable this functionality. If the item is not under model/unit number control, this field is disabled.
Note: You can update unit effectivity through Mass Load for discrete jobs that are unreleased and project related.

6. Save your work.

If you are defining a discrete job, you must save the job before viewing component requirements and operations for that job.